DURABASE CI++

Decoupling mat

SKU CI++ Category

Decoupling mat for laying tiles, slabs and natural stone coverings on critical substrates

Reduced construction time of 5 to 12 weeks for fresh screeds, prevention of screed deformation, bridges cracks and protection against mould growth are just some of the product benefits of the DURABASE CI++ decoupling mat. With fresh screed, the average waiting time (drying time) is 5-12 weeks before tiles can be laid. With the 3-layer structure of DURABASE CI++, tiles can be laid the very next day, i.e. as soon as the floor can be walked on. With its crack bridging properties and optimised shear force protection, it enables tiles to be laid on damaged but still load-bearing old coverings - ideal for renovations and old buildings.
Produkt
Produktzeichnung
Produktgruppenfoto 1

Additional information

Additional information

Lengths

10 m, 30 m, 5 m

Basic material

Polyethylene

Colours(s)

yellow

Heights (b)

4

Technical data sheet (product family) Download
Product brochure Download
Assembly instructions Download

Series overview.
For details, please refer to the current price list or the corresponding data sheet

Our DELIVERY PROGRAM

All products to browse online or download